The biogas plant was successfully commissioned on 8 November 2022 with a rated installed capacity of 1.56 MWe biogas engine. total of 4.63 million tonnes of Carbon Dioxide equivalent (“tCO2-e”), covering Scopes 1, 2, and 3, with Scope 3 emissions dominating at 2.66 million tCO2e. Among Scope 3 emissions, 42.90% result from the procurement of goods and services.
Total Potential Carbon Emission Reduction 54,642.69 tCO2-e per year Good efficiency of mixing, recycling, and disposal procedures meticulously maintained within the anaerobic lagoon.